Support · Mathematics Standard 11–12 – Year 12 – Standard 2 · Critical path analysis

Support Construct a Gantt chart to represent a project from a network diagram indicating the critical path

Resources for the prerequisite content of this dot point: earlier-stage (or earlier sub-level) dot points in the same strand that students usually need first. Use these to fill gaps before or alongside the core lesson.

Prerequisite links are draft mappings generated from the syllabus structure (earlier stage, same strand, closest content). They are being reviewed by teachers. Spot a poor match? Tell us.

← Back to core resources

Prerequisite dot points

Explain that the terms graph and network are interchangeable

Stage 5 · Introduction to networks (Path) Draft mapping

No checked resources on this prerequisite dot point yet.

Explain the difference between trail, circuit, path and cycle

Stage 5 · Introduction to networks (Path) Draft mapping

No checked resources on this prerequisite dot point yet.

Identify the number of faces in a planar graph

Stage 5 · Introduction to networks (Path) Draft mapping

No checked resources on this prerequisite dot point yet.